Skip to main content
PhuAir
HomeServicesAir System Installation

Air System Installation

Design & install optimized air systems — Save 30% energy

😣 Problems You're Facing?

  • Old system: leaks, significant pressure loss

  • Wrong piping design → overloaded compressor

  • No VFD → wasted electricity at low demand

  • No moisture treatment → downstream equipment fails fast

📋 Our Process

1

On-site survey

Measure actual demand, survey layout, assess existing system

2

Technical design

System drawings, select compressor + piping + accessories

3

Installation

Install compressor, piping, moisture treatment, VFD

4

Commission & handover

Test run, fine-tune, train staff, full handover

✅ Why Choose Minh Phu?

  • Free survey
  • Detailed technical drawings
  • On-time installation
  • 12-month system warranty
  • -30% energy optimization
  • Free operation training

🏭 Real Customer Cases

Phong Phu Textile

Textile

35%

Energy Saved

!

15-year-old system, 25% output leakage, unstable pressure, overloaded compressors.

Complete redesign: 2 new units + stainless piping + VFD. 35% energy savings, pressure stable ±0.1 bar.

Thang Long II Industrial Zone

New Factory

12 days

Completed in

!

New factory build needed complete compressed air system for electronics assembly.

A-to-Z installation in 12 days, on schedule. System met ISO cleanroom standards.

❓ Frequently Asked Questions

How long does installation take?+
Small system (1 unit): 1-2 days. Large (multi-unit + piping): 1-3 weeks depending on scale.
Do you provide 3D designs?+
Yes — AutoCAD drawings and detailed system diagrams, approved before construction.
Is the survey free?+
Completely free. We survey, consult, and quote at no charge.